Roads and Bridges Projects

REHABILITATION OF ANUM JUNCTION (OSEBENG) 19KM ROAD PROJECT

  • The Rehabilitation the Anum Junction (OSEBENG) Project involve the construction of a 19KM single road with two lanes with a surface dressing finish. The duration for the project is 24 months starting from the 6th of February, 2020. Contract awarded by the Ministry of Roads and Highways, Ghana Highway Authority.

 
Work activities includes:

  • Construction of concrete drains on both sides of the road
  • Earthwork
  • Pavement and
  • Surfacing Works